Printable bid worksheet Radon mitigation bid checklist for comparing contractor scopes.
Use this page during estimate calls, inspection negotiations, or final bid review. The goal is to make each proposal show the same system details before you compare price.
Collection design Suction point count, pressure-field testing plan, foundation areas covered, and what changes if the slab or crawl space does not communicate.
Routing and fan Fan model, interior or exterior pipe route, roofline discharge location, electrical connection, condensate handling, and visible manometer placement.
Included adders Sump lid, crawl-space membrane, seam tape, edge sealing, slab patches, permits, finished-wall repair, cleanup, and warranty labor.
Verification Post-mitigation test timing, who supplies the kit, acceptable result threshold, retest cadence, and what happens if the first post-work test is still elevated.
Side-by-side bid review
Fill the same line items for every proposal
A cheaper bid is only useful if it includes the same foundation areas, sealing work, testing plan, and warranty response as the more complete proposal.
| Line item | Bid A | Bid B | Bid C |
| Installed price and payment schedule | Notes | Notes | Notes |
| Suction points and fan model | Notes | Notes | Notes |
| Pipe route and discharge location | Notes | Notes | Notes |
| Sump, crawl-space, and sealing scope | Notes | Notes | Notes |
| Permit, electrical, and repair allowances | Notes | Notes | Notes |
| Post-mitigation test and warranty response | Notes | Notes | Notes |